First principles
- 0.1 The company in first principles
- 0.2 Five design laws
- 0.3 The decomposition ladder
- 0.4 Evidence tiers
- 0.5 What changed
0.1 The company in first principles
Pro Exteriors sells finished exteriors: roofs, gutters and siding for homes and commercial buildings across 16 states, from offices in Wichita, Kansas and the Dallas–Fort Worth area. APP2 exists to run that work. Its fundamental units are:
job × milestone × days in stage × dollars (approved value, collected, balance due), with roof squares × trade and crew-days underneath.
The claim every APP2 screen must let a reader test: Every job, every dollar, one screen, owned by Pro Exteriors.
What already exists: a public website (proexteriorsus.com) in navy and red with Inter, and a product direction (the V5 CRM reviews of November 13–15, 2026) that Chandler Milliken reviewed and asked to keep. This system codifies V5 for APP2 and uses AccuLynx only as the reference for workflow and data parity. It does not change the marketing site.
0.2 Five design laws
- The urgent number is the loudest thing on the screen. If 72 invoices are overdue, that number outranks everything that is zero.
- One accountable next action per view. Every page names the action, its owner and its due date, with the evidence beside it (V5's daily path: open the blocker → inspect the evidence → take the permitted action → verify the result).
- Red is for action. Pro Exteriors red (#C62836) marks the one primary action or the one blocker in a view. It is never decoration.
- The milestone is always spelled. Lead, Prospect, Approved, Completed and Invoiced are never shown by colour alone. The letter sits inside the chip and the name or stage sits beside it.
- Money is shown with its tier. A dollar figure is Measured (from the ledger), Entered (typed by staff) or Estimated (a projection), and a figure without a tier is a defect.
When a situation is not covered here, apply the laws.
0.3 The decomposition ladder
| Rung | The reader's question | What the surface shows | Type |
|---|---|---|---|
| Verdict | What needs me today? | One sentence, one number, one action (verdict strip) | 20/28 bold on navy |
| Units | How much, in which stage? | Pipeline chips with counts and dollars | KPI 24–32px, tabular |
| Evidence | Why do you say so? | Action items, aging, the job's evidence | Tables, 14/20 |
| Assumptions | What is this based on? | Tier tags, data dates, "collection progress, not physical completion" | 12px tertiary |
| Falsifier | What would prove it wrong? | The audit trail: history, status changes, linked payments | History table |
The dashboard and the job page are the verdict and units rungs. Lists and the scheduler are evidence rungs. History and invoice status logs are the falsifier.
0.4 Evidence tiers
| Tier | Meaning | Visual tag |
|---|---|---|
| Measured | From the accounting ledger, payment record or supplier invoice | No tag (the default) |
| Entered | Typed by staff, not reconciled yet | pill neutral "Entered" |
| Estimated | Projection or estimate, not contracted | pill info "Est." or the EST. ring |
A number shown without a tier is a defect.
0.5 What changed
| Area | Before (AccuLynx, measured) | Now (APP2) |
|---|---|---|
| Body text | 12px Open Sans, normal leading | 14px/20px Inter, 13px compact mode |
| Headings | Roboto 300 | Inter 700, negative tracking |
| Chrome | Blue #24476C / #4680BF, orange KPIs | Navy #0B1734, red primary actions |
| Dashboard | Same-weight tiles, zero counts as loud as 72 | Verdict strip, zero queues collapsed |
| Milestones | Five bright bubbles | Same order and hues, retuned, ringed, lettered; P1–P10 stepper |
| Modes | Light only | Light / Dark / System |